Eskandarlu, A.
a mechanical engineering graduate from Azad University, has been actively involved in the area of rotating and packaged equipment engineering since 2005. Since he joined Chagalesh Consulting Engineers in 2008, he has been engaged in many hydrocarbon processing projects as a machinery lead engineer. He holds a head position in the machinery department of Chagalesh and is also an instructor of pump and compressor courses.
Compare pitot tube pumps with high-speed centrifugal pumps for low-flow applications
When seeking a pump for a low-flow, high-head application, there is a temptation to choose a high-speed (HS) integral gear-driven centrifugal pump because of its advantages over multi-stage centrifugal and other types of pumps.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction