Schleiffer, A.
Optimize field upgrading of oil sands with slurry-phase combi-cracking technology
Slurry-phase combi-crackers are able to process a much wider range of feeds—including those with very high levels of metals, asphaltenes and sulfur—that cannot be economically upgraded in fixed-bed or ebullated-bed reactors, which makes this process ideal for upgrading oil sands.
Maximize liquid yield from extra heavy oil
Next-generation hydrocracking processes increase conversion of residues
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium launches study to create a consolidated hub for recycled plastics 5/22
- Eni strengthens its global LNG strategy with long-term supply agreements in Indonesia 5/22
- Breakthrough shows how electricity could replace heat to turn CO₂ into useful chemicals 5/22
- bp's Whiting Refinery offers revised proposal to union in ongoing talks 5/22
- Plains oil pipeline partly shut down after rupture in East Los Angeles (U.S.), could disrupt supplies to refineries 5/22
- Vitol moves to open Mexico fuel terminal years after bribery scandal 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

