Biradar, B.
Babanna Biradaris a Principal Engineer with Bechtel India. He has 30 yr of experience in oil, gas and chemicals, infrastructure, metal and mining front-end engineering and detailed design and is a subject matter expert in fire protection and process safety. He holds an ME degree in mechanical engineering from the University of Roorkee, India (now Indian Institute of Technology, Roorkee). He is a member of the NFPA technical committee “Electrical equipment in chemical atmosphere (EEC-AAA),” which is responsible for NFPA 496, NFPA 497 and NFPA 499 standards.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium launches study to create a consolidated hub for recycled plastics 5/22
- Eni strengthens its global LNG strategy with long-term supply agreements in Indonesia 5/22
- Breakthrough shows how electricity could replace heat to turn CO₂ into useful chemicals 5/22
- bp's Whiting Refinery offers revised proposal to union in ongoing talks 5/22
- Plains oil pipeline partly shut down after rupture in East Los Angeles (U.S.), could disrupt supplies to refineries 5/22
- Vitol moves to open Mexico fuel terminal years after bribery scandal 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

