Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Asia refinery 2024–2025 maintenance/outages

The table below lists planned and unplanned refinery shutdowns for 2024–2025 compiled through a survey of Asian oil refiners and market sources.

(* Marks latest updates on planned maintenance or outages)

Latest news:

> PetroChina to close last unit of biggest north China refinery end-June, sources say

> India's BPCL plans to shut Bina refinery unit for 15-day maintenance in August

> Taiwan's Formosa cuts crude processing due to maintenance activities

> Japan's Eneos says unplanned shutdown begins at 77,000-bpd unit at Kawasaki

> Idemitsu restarts Yokkaichi's No.3 CDU on Aug 11 after maintenance

> Idemitsu shuts No.3 CDU at Yokkaichi refinery for maintenance

> Japan's Eneos shuts 77,000-bpd Kawasaki No.3 CDU on August 9 for maintenance

> Idemitsu shuts 165,000-bpd Aichi CDU for scheduled maintenance

> Japan's Eneos restarts two crude distillation units at Kawasaki after shutdown

> Japan's Eneos restarts 77,000-bpd Kawasaki CDU after unplanned shutdown

> Japan's Eneos says unplanned shutdown began at 145,000-bpd Sendai CDU on May 23

> Japan's Cosmo Oil undergoes unplanned shutdown of No.2 CDU in Chiba refinery

> Malaysia's Prefchem restarts gasoline unit after repairs since January, sources say

> Malaysia's PRefChem shuts both residual fluid catalytic cracking units, sources say

> Taiwan's CPC Corp shuts one crude unit at Talin for maintenance until November, sources say

PLANNED TURNAROUND:

       

Country

Company/Location

Unit

Capacity (in '000 bpd unless specified)

Timing

2025

       

CHINA

Sinopec/Beihai

CDU

125

February 25 to April 25

CHINA

CNOOC/Huizhou

CDU

220

Early March, for up to 2 months

CHINA

Sinopec/Jiangsu

CDU

290

End-March to mid-May

CHINA

Sinopec/Jiujiang

CDU

150

March 15 to May 10

CHINA

Sinopec/Gaoqiao

CDU

260

March 20 to May 20

CHINA

Sinopec/Tianjin

No. 3 CDU

220

April 16 to June 14

CHINA

Sinopec/Jinling

CDU

380

April 1 to May 25

CHINA

Sinopec/Hainan

CDU

184

Early April to end-May

CHINA

Sinopec/Shanghai

CDU

320

October 9 to December 7

CHINA

Sinochem/Quanzhou

CDU

300

Q4

CHINA*

PetroChina/Dalian

CDU

200

End June, full closure for relocation

INDIA

MRPL/Mangalore

CDU

144

Mid-May, for 30-45 days

INDIA

Reliance/Jamnagar

Refinery

660

April 9 for 21 days

INDIA

IOC/Gujarat

Refinery

360

June-July

INDIA*

Bharat/Bina

Refinery

156

August 11 for 15 days

TAIWAN

Formosa/Mailiao

RFCC

540

March 3 for 84 days

TAIWAN*

Formosa/Mailiao

Refinery

540

No.2 residue hydrodesulphurisation unit from September 16 to October 26, No.2 residual fluid catalytic cracking unit from September 9 to November 3 (Crude processing reduced to 360,000 bpd from 500,000 bpd)

TAIWAN*

CPC Corp/Talin

CDU

150

Mid September to second half of November

S.KOREA

SK Energy/Ulsan

CDU

110

End-May to end-June

S.KOREA

SK Energy/Ulsan

HDS

40

Mid-March to mid-May

S.KOREA

GS Caltex/Yeosu

CDU

330

End-February to end-March

JAPAN

Eneos/Chiba

CDU

129

January 22 - end-March

JAPAN*

Eneos/Mizushima-B

No. 3 CDU

105

Febuary 26 to June 3

JAPAN*

Eneos/Mizushima-B

CDU

141

May 16 to early July

JAPAN*

Idemitsu/Yokkaichi

No. 3 CDU

155

May 19 to August 11

JAPAN*

Fuji Oil/Sodegaura

CDU

143

May 9 to July 21

JAPAN*

ENEOS/Kawasaki

No. 3 CDU

77

August 9 to late November

JAPAN*

Idemitsu/Aichi

CDU

165

October 8 (undisclosed end date)

JAPAN*

Cosmo/Sakai

CDU

100

August 27 to October

JAPAN*

ENEOS/Kawasaki

No. 2 CDU

172.1

August 16 to late November

2024

       

AUSTRALIA

Ampol/Queensland

Refinery

110

July

INDONESIA

Pertamina/Balikpapan

Refinery (Partial)

200

Third week of February-mid May (reduced production from 260,000 bpd to 60,000 bpd due to upgrading, revamped production to 360 kbd post upgrading)

INDIA

MRPL/Mangalore

CDU

6 million tpy

July - September (three-week long maintenance shutdown)

INDIA

BPCL/Kochi

CDU

6 million tpy

Mid-September (for a month)

INDIA

Nayara Energy/Vadinar

DCU

Unclear

End-August,early September for 3 weeks

JAPAN

Cosmo/Chiba

No. 2 CDU

102

April 29- June 25

JAPAN

Cosmo/Yokkaichi

CDU

86

June 6-early July

JAPAN

ENEOS/Oita

CDU

136

May 13 - late August

JAPAN

ENEOS/Kawasaki

No. 2 CDU

172.1

May 13 - mid August

JAPAN

ENEOS/Kawasaki

No. 3 CDU

77

March 22 - late August

JAPAN

ENEOS/Marifu

CDU

128

Jan. 27 - April 10

JAPAN

Taiyo/Shikoku

No.1 CDU

106

June 25 - mid-July

JAPAN

Taiyo/Shikoku

No. 2 CDU

32

June 26 - mid-July

JAPAN

Idemitsu/Hokkaido

CDU

150

June 22 (a few months)

JAPAN

ENEOS/Negishi

CDU

153

September 9- Late November

SINGAPORE

Singapore Refining Company (SRC)/Jurong island

CDU

290

Mid-August to H2 September

SINGAPORE

Shell/Bukom

CDU

237

Mid-August to early October

MALAYSIA

Prefchem/Pengerang

CDU

300

February 3, likely to restart on March 3

MALAYSIA

Prefchem/Pengerang

RFCC

140

February 3, likely to restart on March 3

S.KOREA

GS Caltex/Yeosu

No. 2 CDU

155

March, one month

S.KOREA

SK Energy/Ulsan

No. 1 and No. 2 VRDS

80

Likely mid-March to mid-April for first unit; end-March to early May for second unit

TAIWAN

Formosa/Mailiao

CDU

40

June (cut run rates by 40,000 bpd to 440,000 bpd)

TAIWAN

Formosa/Mailiao

No. 3 CDU

180

Mid-March (40 days)

TAIWAN

Formosa/Mailiao

No. 2 RDS

80

Mid-March (40 days)

TAIWAN

Formosa/Mailiao

No. 2 RFCC

84

Mid-March (60-70 days)

TAIWAN

Formosa/Mailiao

No. 1 CDU

180

Mid-September (40 days)

TAIWAN

Formosa/Mailiao

No. 1 RDS

80

Mid-September (40 days)

TAIWAN

Formosa/Mailiao

No. 1 RFCC

84

Mid-September

TAIWAN

Formosa/Mailiao

No. 1 Naphtha Cracker

700 tpy

Between June-August

TAIWAN

Formosa/Mailiao

No. 2 Naphtha Cracker

1.03 tpy

January (1-2 months)

VIETNAM

Binh Son/Dung Quat

Refinery

130

March 15 - early May (48-50 days)

         
         

UNPLANNED TURNAROUND:

       

Country

Company/Location

Unit

Capacity ('000 bpd unless specified)

Timing/Reasons

2025

       

S.KOREA

SK Energy/Ulsan

CDU

170

February 26 for 2 weeks

JAPAN

Eneos/Sakai

CDU

140

February 17 (Fire, undisclosed end date)

JAPAN

Eneos/Oita

CDU

136

January 21- January 27 (unknown)

JAPAN*

Eneos/Kawasaki

No. 2 and No. 3 CDU

249.1

April 21 - May 7 (reason undisclosed)

JAPAN*

Eneos/Kawasaki

No. 3 CDU

77

June 4 to June 5 (reason undisclosed)

JAPAN*

Eneos/Mizushima-B

No. 2 CDU

95.2

April 24 - May 16 (reason undisclosed)

JAPAN*

Eneos/Sendai

CDU

145

May 23 (undisclosed reasons or end date)

JAPAN*

Cosmo/Chiba

CDU

102

May 29 (undisclosed reasons or end date)

MALAYSIA*

Prefchem/Pengerang

RFCC

70

End January - May 19 (technical problems)

MALAYSIA*

Prefchem/Pengerang

RFCC

540

September 29, aiming to restart within a week (reason undisclosed)

         

2024

       

JAPAN

Eneos/Kashima

CDU

175

August 20 (undisclosed end date)

JAPAN

Cosmo/Chiba

No. 1 CDU

75

February 7 - February 14 (system trouble)

JAPAN

Eneos/Negishi

CDU

153

February 10 - February 20 (equipment failure)

JAPAN

Eneos/Negishi

CDU

153

March 31 - April 24 (system trouble)

JAPAN

Idemitsu/Aichi

CDU

160

February 6 - February 23 (technical trouble with peripheral equipment)

JAPAN

ENEOS/Sendai

CDU

145

August 1 (undisclosed end date)

JAPAN

ENEOS/Chiba

CDU

129

July 23- July 28

MALAYSIA

Hengyuan/Port Dickson

LRCC

42.7

June 20 (shut down for inspection and repairs after leakage)

S.KOREA

Hyundai/Seosan

CDU

50

June, one week (Reduced crude processing volume at one of the CDUs to about 250,000 bpd about 300,000 bpd)

S.KOREA

Hyundai/Seosan

RFCC

90

Mid-June, 10-14 days (technical issue)

S.KOREA

Hyundai/Seosan

Refinery (Partial)

Exact affected capacity unknown

May (Slight reduction to crude runs to about 87%)

S.KOREA

S-Oil/Onsan

CDU

250

February 23 - February 27 (Fire)

S.KOREA

S-Oil/Onsan

RFCC

73

February 23 - February 27 (Fire, RFCC reduced runs up to 20%)

TAIWAN

Formosa/Mailiao

Refinery Port

NA

Earthquake - April 3 afternoon (Precautionary measure following earthquake)

TAIWAN

Formosa/Mailiao

RFCC

84

June 17 - end June (technical problems)

THAILAND

Thai Oil/Sriracha

No. 3 CDU

180

January 16 - Janurary 28 (Technical problem)

For maintenance plans in the following regions click below:

Middle East REF/ME Europe [REF/E] N. America [REF/US]

NB:

AU - Aromatic Unit

CCU - Catalytic Cracker Unit - makes gasoline

CDU - Crude Distillation Unit - refines crude into products

CFU - Condensate Fractionation Unit

CSU - Condensate Splitter Unit

CCR - Catalytic Reformer

DCU - Delayed Coking Unit

DHDS - Diesel Hydro Desulphurisation Unit

FCC - Fluid Catalytic Cracker - makes gasoline

FCCU - Fluidized Catalytic Cracker Unit

FOHDS- Fuel Oil Hydro Desulphurisation Unit

HOU - Heavy Oil Upgrading - refines fuel oil to lighter products

HCC - Hydro Catalytic Cracker - produces middle distillate fuels

KHDS - Kerosene Hydro Desulphurisation Unit

KHU - Kerosene Hydrotreating Unit

LRCC - Long Residue Catalytic Cracker

RFCC - Residual Fluid Catalytic Cracker - makes gasoline, propylene

RDS - Residual Desulphuriser - reduces sulphur content in product

RHDS - Residue Hydro Desulfurization Unit

RHDS - Residue Hydro Desulphurisation Unit

TBA - To be announced

VDU - Vacuum Distillation Unit

VGO - Vacuum Gasoil Hydrotreater

VRDS - Vacuum Residual Desulphuriser

VSB - Visbreaker

** - thousand tons per year

(Reporting by Asia Energy Desk; Editing by Vijay Kishore)

 

Related News