Address inlet pressure loss concerns with restricted lift relief devices
For the past 30 years, standard-sized relief devices have been sized such that it is difficult to meet the installation criteria in American Petroleum Institute (API) standard (STD) 520. This problem ..
IP: 10.3.12.203
This is a preview of our premium content. Thank you for your interest—please
log in or
subscribe to read the full article.
The Authors
D. Smith - Smith & Burgess LLC, Houston, Texas
Dustin Smith earned a BS degree in chemical engineering from Texas A&M University and is a licensed professional engineer. He co-founded Smith & Burgess in 2007 and serves as Co-Owner and CEO. With more than 25 yr of experience, he specializes in relief systems design, PSM compliance audits, flare system optimization and incident investigations. Smith has contributed to API 520/521 committees and led projects that improved safety, compliance and operational efficiency for clients globally.
Related Articles
From the Archive
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction
Comments