August 2012
Bonus Report: LNG Developments
Use dynamic simulation for advanced LNG plant design
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Authors
Related Articles
- Retrofit hydrocarbon distillation systems using exergy analysis and product optimization: A systematic framework and application to NGL fractionation—Part 1
- Temperature control strategies for distillation columns in the CPI
- Executive Viewpoint: The future of SAF: Challenges, adoption and technologies


Comments