December 2007
Plant Design and Engineering
Integrate HSE concepts in facility design
Incorporating these aspects early in the planning process significantly reduces rework and subsequent costs during construction and operation
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Authors
Related Articles
- Retrofit hydrocarbon distillation systems using exergy analysis and product optimization: A systematic framework and application to NGL fractionation—Part 1
- Temperature control strategies for distillation columns in the CPI
- Executive Viewpoint: The future of SAF: Challenges, adoption and technologies


Comments