Singla, P. K.
Pankaj Kumar Singla works as a Senior Engineer at Worley in Al-Khobar, Saudi Arabia. He has more than 13 yr of experience in the detailed engineering of static equipment in the pre-bid phase, as well as front-end engineering design (FEED) and detailed engineering for various oil and gas, petroleum refining and petrochemical industry projects. Prior to joining Worley, Mr. Singla worked as a Static Equipment Engineer for Fluor Daniel India Pvt. Ltd., Daelim Industrial Co. (South Korea) and as a Senior Engineer at Valdel Engineers & Constructors (India). He holds a B. Tech degree from Punjab Technical University, India. The author can be reached at pankajsingla99@gmail.com.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras delivers LPG sold at steep premiums despite Lula move to annul auction 4/3
- Plug Power to supply 275-MW GenEco electrolyzer system for Hy2gen’s Courant decarbonized ammonium nitrate project 4/3
- Vietnam refinery boosting jet fuel production 4/3
- China plans to upgrade some petrochemical plants, phase out others by 2029 4/3
- Morocco has diesel stocks for 51 days, energy ministry says 4/3
- Nigeria's Seplat Energy hit by strike amid push for higher output 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

