Racette, Y.
Yves Racette is Principal Process Optimization Support Engineer at Valero Energy Corp. His areas of expertise are data historian systems and process unit monitoring.
Use advanced predictive analytics for early detection and warning of column flooding events
In this study, a methodology was implemented to predict crude distillation tower flooding events based on key process variables, including product yields, column pumparound (PA) flowrates, column temperatures and overhead reflux flowrate.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
- Enbridge approves $1.4-B project to boost Canadian oil flows to U.S. refiners 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

