Targeted liquid injection improves shed deck performance
Process Optimization
/ Project Management
/ Refining
/ Americas
/ Asia/Pacific
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Management
/ Middle East
This case study shows how the installation of an unique piping and lance design achieved targeted liquid injection, quenched vapor hot zones and reduced resid entrainment into the heavy coker gasoil product.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction