Aykut Avci, İ
İsmail Aykut Avci started his professional career in 2007 as a Production Engineer at Borusan Mannesmann’s İzmit factory. He joined the Tüpraş İzmit refinery in 2010 and has worked as a Maintenance Engineer, Reliability Chief Engineer and Maintenance Chief Engineer. Mr. Avcı has been working as Maintenance Superintendent since May 2016, responsible for the maintenance and repair of rotating equipment. He graduated from the Istanbul Technical University (ITU) Mechanical Engineering Department in 2007 and completed his MS degree in mechanical engineering at ITU in 2010.
Chemical treatment program for closed-loop cooling system
Closed-loop cooling water (CLCW) systems are utilized in areas where cooling is critical.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction