Putra, Z. A.
is a process engineering and process technology consultant at TMC Chemical in The Netherlands. He has been involved in a wide range of work activities, such as conceptual process designs, feasibility studies, basic engineering design and plant performance evaluations, which include process simulation, optimization and debottlenecking studies. He holds a PDEng degree from Technische Universiteit of Eindhoven.
Improve performance and reduce costs of wastewater treatment plants
The increasing costs of a wastewater treatment plant (WWTP) motivated a major specialty chemical plant to improve the performance of its treatment unit.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras delivers LPG sold at steep premiums despite Lula move to annul auction 4/3
- Plug Power to supply 275-MW GenEco electrolyzer system for Hy2gen’s Courant decarbonized ammonium nitrate project 4/3
- Vietnam refinery boosting jet fuel production 4/3
- China plans to upgrade some petrochemical plants, phase out others by 2029 4/3
- Morocco has diesel stocks for 51 days, energy ministry says 4/3
- Nigeria's Seplat Energy hit by strike amid push for higher output 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

