Abubasha, M. K.
M. Khaleel Abubasha is a mechanical engineering student at Texas A&M University.
Intensive study on damaged wear rings of centrifugal pumps—Part 2
This article is a continuation of Part 1, which discussed the evaluation of two damaged wear rings from centrifugal pump applications—a stationary (inner) ring and a rotating (outer) ring.
Intensive study on damaged wear rings of centrifugal pumps—Part 1
This article is based on damaged wear rings from centrifugal pump applications.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Envision Energy powers world's first green marine ammonia bunkering 7/25
- New catalyst breakthrough could make clean ammonia easier to produce 7/25
- U.S. Gulf refiners seek Middle East, S. American oil to offset Venezuela, Mexico losses 7/25
- CEO of Russia-backed Indian refiner Nayara resigns after EU sanctions 7/25
- PetroChina makes FID for new northeast refinery complex 7/25
- Valero Energy beats Q2 profit estimates as refining margins improve 7/24
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction