Agarwal, P.
is an engineer with the Simulation Group at Technip. He holds a master’s degree (processes and polymers) from Institut Français du Pétrole (IFP) and a bachelor’s degree (Chem. E.) from the National Institute of Technology, Trichy, India.
Use dynamic simulation to increase reliability of hydrogen generation
Through this plant study, a licensor demonstrates effective use of rigorous dynamic simulation tools to implement the new control schemes and configurations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras delivers LPG sold at steep premiums despite Lula move to annul auction 4/3
- Plug Power to supply 275-MW GenEco electrolyzer system for Hy2gen’s Courant decarbonized ammonium nitrate project 4/3
- Vietnam refinery boosting jet fuel production 4/3
- China plans to upgrade some petrochemical plants, phase out others by 2029 4/3
- Morocco has diesel stocks for 51 days, energy ministry says 4/3
- Nigeria's Seplat Energy hit by strike amid push for higher output 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

