Agarwal, P.
is an engineer with the Simulation Group at Technip. He holds a master’s degree (processes and polymers) from Institut Français du Pétrole (IFP) and a bachelor’s degree (Chem. E.) from the National Institute of Technology, Trichy, India.
Use dynamic simulation to increase reliability of hydrogen generation
Through this plant study, a licensor demonstrates effective use of rigorous dynamic simulation tools to implement the new control schemes and configurations.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction