Agarwal, P.
is an engineer with the Simulation Group at Technip. He holds a master’s degree (processes and polymers) from Institut Français du Pétrole (IFP) and a bachelor’s degree (Chem. E.) from the National Institute of Technology, Trichy, India.
Use dynamic simulation to increase reliability of hydrogen generation
Through this plant study, a licensor demonstrates effective use of rigorous dynamic simulation tools to implement the new control schemes and configurations.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LyondellBasell to sell select European petrochemical assets to AEQUITA 6/9
- Rotork joins Rockwell Automation’s Technology Partner Program 6/9
- California (U.S.) fuel imports hit 4-yr high amid refinery outages 6/9
- Finavia's Helsinki Airport uses Neste MY Renewable Diesel to drive operations to net-zero carbon emissions 6/9
- Honeywell drives industrial transition from automation to autonomy with new AI-enabled digital suite 6/9
- Yokogawa releases next generation of CENTUM VP integrated production control system 6/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction