Goettler, L.
Leah Goettler is a Chemical Engineer with 4 yr of experience as a Process Engineer-in-Training at Sulphur Experts. During that time, she has been directly involved in more than 35 different sulfur recovery plant projects, with work ranging from testing and optimization to design evaluations across North America, Europe, Asia and the Eastern Mediterranean.
Impact of biofeed retrofits, co-processing on refinery amine units, SWSs and SRUs—Part 2
Environment & Safety
/ Process Optimization
/ Refining
/ Aromatics
/ Biofuels
/ Carbon Management
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Products
/ Reactors
/ Treating
Producing diesel with a portion of biologically sourced carbon is being done at an increasing number of conventional crude oil refineries.
Impact of biofeed retrofits, coprocessing on refinery amine units, SWSs and SRUs—Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Construction
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Loss Prevention
/ Products
/ Reactors
Diesel with a portion of biologically sourced carbon is being produced at an increasing number of conventional crude oil refineries.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Transitional Industries and CFEnergia sign feedstock supply contract for $3.3-B Pacifico Mexinol project 2/17
- Neste and World Fuel Services extend partnership, expanding SAF availability at more than 100 airports in Europe 2/17
- U.S. refined product exports by tanker increase to > 6.3 MMbpd in January 2/17
- Japan's oil and gas independence climbs to highest since 2009 2/17
- Dangote signs $400-MM equipment deal with China's XCMG to speed up refinery expansion 2/17
- Former Lukoil-owned ISAB refinery in Sicily exits crisis procedure 2/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction