Khidirov, B.
Beykes Khidirov is a Senior Economics Consultant involved in SOCAR projects. Prior to this role, he was head of the technological development department for refining complexes in SOCAR. Dr. Khidirov has more than 55 yr of experience in refinery and petrochemical economics.
Technical considerations for the Heydar Aliyev refinery revamp
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Refining
/ Acid Gas Removal
/ Europe
/ Construction
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Gasoline
/ Greenhouse Gases
/ Hydrotreating
/ Naphtha
/ Natural Gas
/ Products
/ Pumps
/ Reactors
/ Safety
/ Treating
The following case study describes the early development phases of SOCAR’s ongoing major revamp project at the Heydar Aliyev Refinery (HAR) in Baku, Azerbaijan, and its interface with the associated Azerikimya (AZK) steam cracking complex near Sumgait. References are made to the related SOCAR polymer project in Sumgayit, as well.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Indian Oil buys first Colombian oil under Ecopetrol contract 12/31
- Ukrainian drone attack sparks fire, damages equipment at Tuapse refinery 12/31
- Chile's $2.5-B Volta green ammonia project wins environmental permit 12/31
- China begins issuing second batch of 2026 crude import quotas to refiners 12/31
- EIA: U.S. crude, fuel inventories rose in the week ended December 19 12/30
- Ghana's Tema oil refinery restarts after 9-yr shutdown 12/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

