Evaluate pressure relief system forces in existing installations
The purpose of this study is to limit the number of relief valves that require rigorous engineering calculations to determine the adequacy of the installation.
Ensuring safe operations when fulfilling action item requirements
Consider implementing this criteria to accurately document the process
Accurately predict radiation from flare stacks
Using this technique can take the guess work out of design calculations and improve costs
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction