Al-Meshari, A.
How Cr compounds discolor refractory brick walls of an ethylene cracking furnace
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Aromatics
/ Asia/Pacific
/ Corrosion
/ Engineering & Design
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
Unusual pink coloration was noticed on the entire refractory brick wall in the radiant section of an ethylene cracking furnace of a petrochemical plant. The problem was investigated by evaluating the ..
Investigation: Failure of a surface condenser titanium tube
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Middle East
/ Piping
Advanced analytic methods determine contributing factors in heat exchanger corrosion problem
Failure analysis of a primary reformer riser
Investigation revealed the root cause was creep rupture
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction