Winter, G.
Gabriel Winter is an Engineering Specialist with Saudi Aramco. He has more than 20 yr of experience in the areas of process design, process simulation and optimization. In his current position at Aramco, he works with various departments and business lines to develop applications and solutions, using process simulation and optimization models. He earned a Bch degree in chemical engineering from the University of Texas at Austin.
Enhanced unit monitoring enabled by digital twin
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Hydrocracking
/ Information Systems
/ Loss Prevention
/ Reactors
/ Middle East
Process engineers must continuously monitor the health and performance of process units.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Indian Oil buys first Colombian oil under Ecopetrol contract 12/31
- Ukrainian drone attack sparks fire, damages equipment at Tuapse refinery 12/31
- Chile's $2.5-B Volta green ammonia project wins environmental permit 12/31
- China begins issuing second batch of 2026 crude import quotas to refiners 12/31
- EIA: U.S. crude, fuel inventories rose in the week ended December 19 12/30
- Ghana's Tema oil refinery restarts after 9-yr shutdown 12/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

