Subaie, E.
Eid Subaie is a Plant Operation Engineer with Saudi Aramco at the company’s Eastern region terminal operations at the Ju’aymah Tank Farm. He has 16 yr of experience in industrial operating facilities, resolving operational upsets and plant problems.
Resolving vibration problems in a crude booster pump
Valves
/ Pumps
/ Loss Prevention
/ Equipment
/ Engineering & Design
/ Maintenance & Reliability
/ Refining
/ Corrosion
/ Compressors
The pumps referred to in this article are 2,600-HP vertical pumps utilized as booster pumps for the shipment of crude oil.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction