Khan, S.
Sharib Khan is a Reliability Engineer with Saudi Aramco. He has 32 yr of rotating equipment experience in oilfield plants, with an emphasis on pumps, gas turbines, air and gas compressor systems, and troubleshooting. Mr. Khan is also a certified reliability leader, a certified maintenance and reliability professional, a certified vibration analyst (ISO Category 3) and a certified machinery lubrication analyst. He earned a BS degree in mechanical engineering from Aligarh Muslim University in Aligarh, India.
Pump recycle line optimization and energy savings
The objective of this article is to demonstrate the benefits of optimizing the pumping system through pump recycle line evaluations.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Envision Energy powers world's first green marine ammonia bunkering 7/25
- New catalyst breakthrough could make clean ammonia easier to produce 7/25
- U.S. Gulf refiners seek Middle East, S. American oil to offset Venezuela, Mexico losses 7/25
- CEO of Russia-backed Indian refiner Nayara resigns after EU sanctions 7/25
- PetroChina makes FID for new northeast refinery complex 7/25
- Valero Energy beats Q2 profit estimates as refining margins improve 7/24
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction