Wesam A. Alharbi has been working as a Vibration Engineer at Saudi Aramco’s Consulting Services Department since 2015. He provides technical consultations to resolve complex rotating machinery and static equipment vibration issues. His scope covers all Saudi Aramco oil and gas facilities in Saudi Arabia. Mr. Alharbi holds several international certifications in the field of condition monitoring and reliability and has a wide experience in technology evaluation and deployment of pilot programs.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction