Zolfkhani, M.
Optimize LNG boil-off gas systems for regasification terminals
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gas to liquids (GTL)
/ Gasification
/ Middle East
/ Natural Gas
Depending on LNG composition, N2 content and plant operating mode, an operating pressure of 7 barg to 8 barg was found by the study to be the optimum pressure range.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LyondellBasell to sell select European petrochemical assets to AEQUITA 6/9
- Shell reports June 4 fire at ethylene cracker plant in Pennsylvania (U.S.) 6/9
- Plug Power, Allied Green Ammonia partner for $5.5-B, 2-GW electrolyzer project to produce SAF, green urea and green diesel 6/9
- Ebara Elliott Energy signs high-speed balancing bunker agreement to expand Middle East footprint 6/9
- Rotork joins Rockwell Automation’s Technology Partner Program 6/9
- California (U.S.) fuel imports hit 4-yr high amid refinery outages 6/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction