Nyadong, L.
is a Senior Scientist in Phillips 66’s Energy Research and Innovation (ERI) organization. He has more than 10 yr of experience in the petroleum industry, developing and implementing advanced analytical methods to support Phillips 66’s ERI and worldwide organizations. He earned a BS degree in chemistry and materials science technology from the University of Buea in Cameroon, an MS degree in biochemistry from the University of Toledo in Ohio, and a PhD in analytical chemistry from the Georgia Institute of Technology in Atlanta.
Investigation and diagnosis of startup foaming issues at a new tail gas treater
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Boilers
/ Catalysts
/ Distillation
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Naphtha
/ Piping
/ Products
/ Reactors
/ Sulfur
/ Treating
/ Americas
In May 2021, Phillips 66 started up a new methyl diethanolamine (MDEA)-based tail gas unit at its Belle Chasse, Louisiana, refinery.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Indian Oil buys first Colombian oil under Ecopetrol contract 12/31
- Ukrainian drone attack sparks fire, damages equipment at Tuapse refinery 12/31
- Chile's $2.5-B Volta green ammonia project wins environmental permit 12/31
- China begins issuing second batch of 2026 crude import quotas to refiners 12/31
- EIA: U.S. crude, fuel inventories rose in the week ended December 19 12/30
- Ghana's Tema oil refinery restarts after 9-yr shutdown 12/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

