Mosir, M.
Marina Mosir has more than 15 yr of work experiences in the refining and natural gas/LNG industry as a Process Engineer, Lead Process Engineer and Engineering Manager for various Petronas operating units and capital projects. She is a mass transfer design expert within Petronas, with more than 12 yr of experience in revamping, troubleshooting and designing distillation columns and separators.
Optimizing for viability—VDU revamp in a brownfield project
Process Optimization
/ Refining
/ Distillation
/ Economics
/ Engineering & Design
/ Heat Transfer
/ Loss Prevention
/ Asia/Pacific
Revamping an existing column in an operating plant for higher throughput is a challenge, especially when the column is already operating at its rated capacity.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction