Mokhtar, I. S. A. M.
Ir. Saiful Anuar Mohd Mokhtar has more than 18 yr of work experience in the refining, natural gas/LNG and petrochemical sectors as an Engineering Manager and Head Process Engineer for various Petronas capital projects. At present, he is the Head Process Engineer for Petronas Chemical Group’s titanium program. Mr. Mokhtar is a Chartered Chemical Engineer (CEng) with IChemE and a Professional Engineer (PEng) with the Board of Engineers Malaysia.
Optimizing for viability—VDU revamp in a brownfield project
Process Optimization
/ Refining
/ Distillation
/ Economics
/ Engineering & Design
/ Heat Transfer
/ Loss Prevention
/ Asia/Pacific
Revamping an existing column in an operating plant for higher throughput is a challenge, especially when the column is already operating at its rated capacity.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LyondellBasell to sell select European petrochemical assets to AEQUITA 6/9
- Shell reports June 4 fire at ethylene cracker plant in Pennsylvania (U.S.) 6/9
- Plug Power, Allied Green Ammonia partner for $5.5-B, 2-GW electrolyzer project to produce SAF, green urea and green diesel 6/9
- Carbon Clean, MODEC to accelerate the scale-up of CycloneCC for offshore carbon capture 6/9
- Ebara Elliott Energy signs high-speed balancing bunker agreement to expand Middle East footprint 6/9
- Rotork joins Rockwell Automation’s Technology Partner Program 6/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction