Patel, S.
Typical fired heater problems and root causes
A quick look at symptoms can provide operational answers
Canadian oil sands: Opportunities, technologies and challenges
Energy resources found at the Arctic Circle have potential
Spot energy-savings opportunities in your plant
Choosing the appropriate equipment design and other system components can improve system reliability and save money
Understand the difference between solid and serrated fins
Here are the advantages and disadvantages of each type and how to calculate their surface areas and efficiencies
Optimizing O2 levels in fired heaters
Here's the procedure this plant used to reduce fuel consumption and emissions
Simplify your thermal efficiency calculation
Standard charts and a spreadsheet help
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction