Patel, S.
Typical fired heater problems and root causes
A quick look at symptoms can provide operational answers
Canadian oil sands: Opportunities, technologies and challenges
Energy resources found at the Arctic Circle have potential
Spot energy-savings opportunities in your plant
Choosing the appropriate equipment design and other system components can improve system reliability and save money
Understand the difference between solid and serrated fins
Here are the advantages and disadvantages of each type and how to calculate their surface areas and efficiencies
Optimizing O2 levels in fired heaters
Here's the procedure this plant used to reduce fuel consumption and emissions
Simplify your thermal efficiency calculation
Standard charts and a spreadsheet help
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Transitional Industries and CFEnergia sign feedstock supply contract for $3.3-B Pacifico Mexinol project 2/17
- Neste and World Fuel Services extend partnership, expanding SAF availability at more than 100 airports in Europe 2/17
- U.S. refined product exports by tanker increase to > 6.3 MMbpd in January 2/17
- Japan's oil and gas independence climbs to highest since 2009 2/17
- Dangote signs $400-MM equipment deal with China's XCMG to speed up refinery expansion 2/17
- Former Lukoil-owned ISAB refinery in Sicily exits crisis procedure 2/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

