Myers, P. E.
Philip Myers is the Founder of PEMY Consulting LLC. He has worked with the American Petroleum Institute (API) to develop large-diameter tank fire studies, and with other groups to develop the “Last Fire” initiative—sponsored by ExxonMobil, Chevron and BP.
Extended vapor cloud analysis methodology—Part 2
Europe
/ Construction
/ Diesel
/ Environment & Safety
/ Environment
/ Engineering & Design
/ Loss Prevention
/ Products
/ Refining
The Buncefield explosion in the UK was the worst post-World War 2 fire/explosion incident.
Extended vapor cloud analysis methodology—Part 1
Environment & Safety
/ Maintenance & Reliability
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Management
/ People
/ Products
/ Europe
The Buncefield explosion was the worst post World War 2 fire/explosion incident.
Consider robust tank overfill prevention and independent alarm and gauging systems
Environment & Safety
/ Maintenance & Reliability
/ Analyzers
/ Economics
/ Environment
/ Information Systems
/ Loss Prevention
/ Safety
Elimination of tank overfills is a significant problem for the petroleum industry. Since most tank receiving operations are manual, the operators rely heavily on tank level gauges and alarms for overf..
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction