Pelham, R. O.
Improve the performance of your existing steam system
This discussion tracks a material flow through the steam system, starting with feed and continuing with steam generation, steam uses and, finally, condensate recovery.
Improve your plantwide steam network
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Boilers
/ Corrosion
/ Economics
/ Engineering & Design
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Safety
/ Utilities
/ Valves
When optimizing an existing steam network, design and process engineers need a complete understanding of all aspects of the existing system. Accurate energy and material balances must be established.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras delivers LPG sold at steep premiums despite Lula move to annul auction 4/3
- Plug Power to supply 275-MW GenEco electrolyzer system for Hy2gen’s Courant decarbonized ammonium nitrate project 4/3
- Vietnam refinery boosting jet fuel production 4/3
- China plans to upgrade some petrochemical plants, phase out others by 2029 4/3
- Morocco has diesel stocks for 51 days, energy ministry says 4/3
- Nigeria's Seplat Energy hit by strike amid push for higher output 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

