Bub, A.
Andreas Bub joined Linde in 2008 as a Process Engineer for natural gas plants. In this role, he led several NGL, LNG, NRU and helium projects worldwide. Since 2023, Bub has led the Process Design Group for natural gas plants for the product line Sustainable Hydrocarbon Solutions. He earned an MS degree in chemical engineering from the Technical University of Karlsruhe.
A novel process and machinery unit for the highly efficient liquefaction of renewable natural gases
Carbon Management
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Gas Processing/LNG
/ Loss Prevention
/ Natural Gas
/ Process Optimization
/ Project Management
/ Reactors
/ Treating
The authors’ company has developed a gas expansion-based liquefaction processa using a proprietary machine called a compander. This article describes the newly developed process, including ease of operation and permitting, as well as high quality thanks to in-house design, manufacturing, assembly and testing of key components.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LyondellBasell to sell select European petrochemical assets to AEQUITA 6/9
- Rotork joins Rockwell Automation’s Technology Partner Program 6/9
- Finavia's Helsinki Airport uses Neste MY Renewable Diesel to drive operations to net-zero carbon emissions 6/9
- Honeywell drives industrial transition from automation to autonomy with new AI-enabled digital suite 6/9
- Yokogawa releases next generation of CENTUM VP integrated production control system 6/9
- Alpek will cease operations at its PET facility in North Carolina (U.S.) 6/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction