Van Doorn, E.
Edwin van Doorn is a Fluor Corp. Fellow and Director of heat transfer at Fluor Amsterdam, with more than 20 yr of experience in industry. He serves on the Technical Committee HTRI and Expert Area Energy Efficiency Committee. Mr. van Doorn obtained his academic degree in engineering from the University of Eindhoven.
Stable thermosiphon reboiler operation: With or without a valve in the inlet piping?
A reboiler provides the necessary heat duty for the separation in a distillation tower.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
- Enbridge approves $1.4-B project to boost Canadian oil flows to U.S. refiners 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

