Omota, F.
Florin Omota is a Senior Process Engineering Manager at Fluor in Amsterdam. He joined Fluor in 2005, where he is recognized as a subject matter expert in process control. In 2018, he became a Certified Functional Safety Expert by Exida. He also worked as Chief Engineer in an ether glycol and derivatives plant at Chimopar SA in Bucharest, Romania. In 1999, he joined the Chemical Engineering Department at the University of Amsterdam as a researcher in process simulation and reactive distillation. He holds a PhD in catalyst modification, slurry reactor performance improvement and scale-up.
Steam generator in a hydrocracker high-pressure loop—why not?
Environment & Safety
/ Refining
/ Engineering & Design
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Safety
Historically, there has been a perception in the industry that it is not safe to include a steam generator in the high-pressure loop of a hydrocracker.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
- Enbridge approves $1.4-B project to boost Canadian oil flows to U.S. refiners 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

