Mandal, M.
Optimize heat exchanger installations
Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Furnaces
/ Heat Transfer
/ Management
/ Middle East
This case study proves that a systematic approach for thermal design can identify substantial savings in projects
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Aster Chemicals declares force majeure at Singapore naphtha cracker 8/29
- Orlen signs 1-yr deal with Equinor for supply of 15% oil it uses 8/29
- Novatek partially resumed processing at Ust-Luga complex 8/29
- Phillips 66 to begin winding down Los Angeles-area refinery next week 8/29
- Update: Mexico's Minatitlan refinery back online, Olmeca still down 8/29
- SIBUR produces test batch of first hexane plant in Russia 8/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction