Singh, S. R.
Sheo Raj Singh is a graduate in chemical engineering from IIT Kanpur. He joined EIL in 1981 and holds the position of head of R&D. During his long association with EIL, he has been involved in developing and implementing several process technologies and computational tools to improve the design and operation of industrial processes.
Boost capacity of SRUs with mixing devices for oxygen enrichment
The requirement for additional sulfur recovery unit capacity in a refinery may stem from hydroprocessing operations; a refinery expansion project; a shift from lighter to heavier, sourer crudes to improve margins; or the need to remove extra sulfur content to meet tighter environmental regulations.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LyondellBasell to sell select European petrochemical assets to AEQUITA 6/9
- Shell reports June 4 fire at ethylene cracker plant in Pennsylvania (U.S.) 6/9
- Plug Power, Allied Green Ammonia partner for $5.5-B, 2-GW electrolyzer project to produce SAF, green urea and green diesel 6/9
- Carbon Clean, MODEC to accelerate the scale-up of CycloneCC for offshore carbon capture 6/9
- Ebara Elliott Energy signs high-speed balancing bunker agreement to expand Middle East footprint 6/9
- Rotork joins Rockwell Automation’s Technology Partner Program 6/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction