Casado Flores, E.
Improve pressure drop calculations for saturated water lines
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Boilers
/ Construction
/ Engineering & Design
/ Equipment
/ Europe
/ Furnaces
/ Heat Transfer
/ Loss Prevention
/ Middle East
/ Piping
/ Safety
/ Utilities
/ Valves
When saturated water flows through pipes and components, it flashes—thus increasing its specific volume and limiting the fluid flowrate. Due to these conditions, the calculation and design for pi..
Maximum throttling of manual valves without damage
Use these graphs to avoid damage to internals and piping
Avoid cavitation in butterfly valves
Use these coefficients to determine safe throttling positions
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LyondellBasell to sell select European petrochemical assets to AEQUITA 6/9
- Shell reports June 4 fire at ethylene cracker plant in Pennsylvania (U.S.) 6/9
- Plug Power, Allied Green Ammonia partner for $5.5-B, 2-GW electrolyzer project to produce SAF, green urea and green diesel 6/9
- Carbon Clean, MODEC to accelerate the scale-up of CycloneCC for offshore carbon capture 6/9
- Ebara Elliott Energy signs high-speed balancing bunker agreement to expand Middle East footprint 6/9
- Rotork joins Rockwell Automation’s Technology Partner Program 6/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction