Indgjer, M.
Mark Indgjer joined Det-Tronics in 2017 as an Applications Engineer for F&G safety systems. He has held a variety of roles in the fire industry for more than 25 yr. At present, he provides systems applications support and training for Det-Tronics. Mr. Indgjer holds a BS degree in marketing and is NICET Level II certified.
Integrating fire and gas safety with process control systems: Why, what and how
Environment & Safety
/ Gas Processing/LNG
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Americas
/ Asia/Pacific
/ Middle East
/ Petrochemicals
/ Loss Prevention
/ Refining
/ Safety
If a fire, smoke or gas leak is detected in a hydrocarbon processing facility, prescriptive actions must be taken by the fire and gas (F&G) safety system, as well as by the process control system (PCS), to mitigate and control the hazard.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction