Zengjun, Y.
Yang Zengjun is a Senior Engineer at CTCI Beijing, a CTCI company. He is also a member of the CPCEA HVAC Professional Committee, a registered utility engineer (HVAC, power), a registered constructor and a registered consulting engineer. He is primarily engaged in HVAC design for petrochemical plants.
Design optimization of an HVAC system in a petrochemical plant’s controls building
Distributed Control System
/ Environment
/ Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Process Control
/ Engineering & Design
/ Safety
Since petrochemical plant control buildings are usually designed to be blast-resistant without external windows, convection ventilation cannot be carried out, leading to poor air circulation. As a result, there are higher requirements for indoor air quality, and it is necessary to optimize the heating, ventilation and air conditioning (HVAC) system design scheme to improve air quality.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LyondellBasell to sell select European petrochemical assets to AEQUITA 6/9
- Shell reports June 4 fire at ethylene cracker plant in Pennsylvania (U.S.) 6/9
- Plug Power, Allied Green Ammonia partner for $5.5-B, 2-GW electrolyzer project to produce SAF, green urea and green diesel 6/9
- Carbon Clean, MODEC to accelerate the scale-up of CycloneCC for offshore carbon capture 6/9
- Ebara Elliott Energy signs high-speed balancing bunker agreement to expand Middle East footprint 6/9
- Rotork joins Rockwell Automation’s Technology Partner Program 6/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction