Poussin, G.
Guillaume Poussin is the Group Managing Director at CREALYST-Group. He has more than 15 yr of experience in the study and development of technologies concerning particle behavior during filling processes of cylindrical vessels for different applications (e.g., for catalysts and adsorbents and the agricultural storage of grain).
Solving maldistribution: Catalyst loading and why it matters
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Catalysts
/ Economics
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Reactors
/ Americas
/ Europe
Are your reactor yields lower than forecast? Does your fixed-bed catalytic reactor suffer from hotspots?
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
- Enbridge approves $1.4-B project to boost Canadian oil flows to U.S. refiners 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

