Pendergrass, J.
John Pendergrass is a Senior Engineer at CPFD LLC with 26 yr of experience applying simulations to multiphase processes. He has worked in the petrochemical industry with both engineering/design and simulation services companies. Over the past 6 yr, he has executed multiple full-scale simulation projects for FCCUs.
Viva Energy’s Geelong refinery reduces FCCU turnaround risk
Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Refining
/ Catalysts
/ Loss Prevention
/ Management
/ Safety
Change involves risk. Many fluidized catalytic cracking units (FCCUs) can be operated more profitably, but changes to achieve more efficient operations can be risky.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LyondellBasell to sell select European petrochemical assets to AEQUITA 6/9
- Shell reports June 4 fire at ethylene cracker plant in Pennsylvania (U.S.) 6/9
- Plug Power, Allied Green Ammonia partner for $5.5-B, 2-GW electrolyzer project to produce SAF, green urea and green diesel 6/9
- Carbon Clean, MODEC to accelerate the scale-up of CycloneCC for offshore carbon capture 6/9
- Ebara Elliott Energy signs high-speed balancing bunker agreement to expand Middle East footprint 6/9
- Rotork joins Rockwell Automation’s Technology Partner Program 6/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction