Lai, H.
Haiming Lai is a Principal Consultant with Integrated Oilsands and Bitumen Project of China National Offshore Oil Corp. (CNOOC) in Calgary, Canada. He has more than 20 yr of experience in modeling and simulation, process design and operation in the upgrading, refining and petrochemical industries. He holds a PhD in chemical engineering from Beijing University of Chemical Technology and is a registered professional engineer in Alberta, Canada.
Debottleneck H2 production for gasifier PSA-based plant
The Canadian oil sands reserves in the area surrounding Fort McMurray, Alberta in Canada contain in excess of 165 Bbbl of recoverable bitumen.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
- Enbridge approves $1.4-B project to boost Canadian oil flows to U.S. refiners 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

