Aleynik, B.
Boris Aleynik co-authored this article, but is no longer employed by Emerson. He was formerly part of the team responsible for Rosemount liquid analysis products. He holds a BS degree in mechanical engineering from Iowa State University and an MBA degree from the Kellogg School of Management, Northwestern University.
Improved cooling system performance begins with data
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Analyzers
/ Compressors
/ Corrosion
/ Crude oil
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ Management
/ Safety
/ Americas
Refineries consume large amounts of energy and water to refine crude oil into products. Up to 10% of crude oil’s energy content is consumed during processing, and it takes 1.5 bbl of water to process one barrel of crude oil. Refining processes also generate large quantities of excess thermal energy that needs to be expelled into the environment using a once-through or recirculating cooling system.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
- Enbridge approves $1.4-B project to boost Canadian oil flows to U.S. refiners 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

