Gerhardt, M.
Matthew Gerhardt is Vice President of industrial water at Brown and Caldwell, specializing in wastewater selenium and trace metals removal. He started his career at Chevron Research Co. and has more than 30 yr of experience in refinery water and wastewater treatment. He holds a BS degree in chemical engineering from Cornell University and a PhD in civil/environmental engineering from UC Berkeley.
Options for meeting wastewater effluent selenium limits
Wastewater treatment units (WWTUs) in petroleum refineries are designed to meet effluent limitations incorporated into National Pollutant Discharge Elimination System (NPDES) permits for “conventional pollutants.”
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Indian Oil buys first Colombian oil under Ecopetrol contract 12/31
- Ukrainian drone attack sparks fire, damages equipment at Tuapse refinery 12/31
- Chile's $2.5-B Volta green ammonia project wins environmental permit 12/31
- China begins issuing second batch of 2026 crude import quotas to refiners 12/31
- EIA: U.S. crude, fuel inventories rose in the week ended December 19 12/30
- Ghana's Tema oil refinery restarts after 9-yr shutdown 12/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

