Price, B. C.
Reduce air emissions from natural gas vaporization units
New revaporizing method mitigates air pollutant releases while maintaining process efficiency
Developing mid-scale LNG projects from the contractor's perspective
Modular liquefaction methods reduce construction and operating costs for smaller reserve developments
Optimize energy consumption for LNG vaporization
New methods maximize heat transfer to regasify natural gas with minimum environmental impacts
Achieving world-class operating performance
Apply appropriate reliability and operating improvement techniques in an integrated process to match plant capabilities
Optimize energy integration for LNG terminals
Integrating heating requirements with adjacent facilities can provide economic bonus while improving operating efficiencies
Small-scale LNG facility development
Include these vital design characteristics for improved project costs
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Envision Energy powers world's first green marine ammonia bunkering 7/25
- New catalyst breakthrough could make clean ammonia easier to produce 7/25
- U.S. Gulf refiners seek Middle East, S. American oil to offset Venezuela, Mexico losses 7/25
- CEO of Russia-backed Indian refiner Nayara resigns after EU sanctions 7/25
- PetroChina makes FID for new northeast refinery complex 7/25
- Valero Energy beats Q2 profit estimates as refining margins improve 7/24
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction