Fausto Fusari is Vice President of Technology at Belleli Energy CPE in Mantova, Italy. Mr. Fusari began his career at the Belleli Energy CPE Mantova shop as a welding engineer in 1980, and was appointed Welding Engineering Supervisor in 1989. He earned a master’s degree in welding engineering in 1977.
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Envision Energy powers world's first green marine ammonia bunkering 7/25
- New catalyst breakthrough could make clean ammonia easier to produce 7/25
- U.S. Gulf refiners seek Middle East, S. American oil to offset Venezuela, Mexico losses 7/25
- CEO of Russia-backed Indian refiner Nayara resigns after EU sanctions 7/25
- PetroChina makes FID for new northeast refinery complex 7/25
- Valero Energy beats Q2 profit estimates as refining margins improve 7/24
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction