Spalding, M.
Michael Spalding has been a Coking Mechanical Specialist with Bechtel Hydrocarbon Technology Solutions Inc. (BHTS) for the past 5 yr.
Enhanced flash zone design for coker fractionators
Process Optimization
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Africa
/ Americas
/ Asia/Pacific
/ Europe
/ Middle East
Since the flash zone is the first process undergone by the coke drum effluent vapor upon entering the column, the operation of the flash zone is critical to the operation of the entire coker fractionator column.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LyondellBasell to sell select European petrochemical assets to AEQUITA 6/9
- Shell reports June 4 fire at ethylene cracker plant in Pennsylvania (U.S.) 6/9
- Plug Power, Allied Green Ammonia partner for $5.5-B, 2-GW electrolyzer project to produce SAF, green urea and green diesel 6/9
- Carbon Clean, MODEC to accelerate the scale-up of CycloneCC for offshore carbon capture 6/9
- Ebara Elliott Energy signs high-speed balancing bunker agreement to expand Middle East footprint 6/9
- Rotork joins Rockwell Automation’s Technology Partner Program 6/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction