Dyment, J.
Jennifer Dyment is a member of AspenTech’s product team. She advises oil, gas and petrochemical customers on how to meet operational challenges with AspenTech’s aspenONE Engineering solutions. Ms. Dyment’s background is in chemical engineering. She is a graduate of the Thayer School of Engineering at Dartmouth College.
Optimizing the dehydration process with advanced process simulation
Gas Processing/LNG
/ Acid Gas Removal
/ Aromatics
/ Boilers
/ Process Optimization
/ Engineering & Design
/ Environment
/ Loss Prevention
/ Natural Gas
/ Safety
/ Treating
In the operation of natural gas pipelines, a blockage or leak can cause expensive production losses, damage equipment and pose safety hazards.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Transitional Industries and CFEnergia sign feedstock supply contract for $3.3-B Pacifico Mexinol project 2/17
- Neste and World Fuel Services extend partnership, expanding SAF availability at more than 100 airports in Europe 2/17
- U.S. refined product exports by tanker increase to > 6.3 MMbpd in January 2/17
- Japan's oil and gas independence climbs to highest since 2009 2/17
- Dangote signs $400-MM equipment deal with China's XCMG to speed up refinery expansion 2/17
- Former Lukoil-owned ISAB refinery in Sicily exits crisis procedure 2/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

