Banerjee, P.
Implementing advanced process control on ammonia plants
Petrochemicals
/ Process Control
/ Process Optimization
/ Project Management
/ Acid Gas Removal
/ Americas
/ Analyzers
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Information Systems
/ Management
/ Middle East
/ Safety
Benefits exceeding the guarantee were realized through APC by simultaneously stabilizing and optimizing the plant in the presence of significant feed density variations that impact the entire plant operation
Implementing and maintaining advanced process control on continuous catalytic reforming
The primary benefit was an increase in reformate octane barrel yield from operating the plant at its economic constraints
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
- Enbridge approves $1.4-B project to boost Canadian oil flows to U.S. refiners 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

