Fleshman, J.
Jim Fleshman is a Principal Consultant with Arivergy LLC. Most of his 39 yr of industry experience was with Foster Wheeler USA. He has extensive process design, technology and engineering expertise in the areas of hydrogen/syngas, gas treating, natural gas liquefaction and sour water stripping/amine treating, as well as in process design packages, revamp design and engineering, troubleshooting, studies and PMC team roles.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction