Sarwat, A
Adnan Sarwat has more than 25 yr of project and maintenance/turnaround experience in both the downstream and upstream sectors while mainly working in the Middle East with international oil companies. As a mechanical engineer, he has a passion for using his practical experience to train and mentor fellow and young engineers.
Photography in the oil and gas industry: Its significance and best practices
Producing photographs of and within process plants requires special attention and discipline.
Arranging lines in a pipe rack: How to standardize pipe spacing in the oil and gas industry
This article provides deep insight to piping layout engineers, presenting a holistic/systematic approach for pipe spacing based on different pipe supports—e.g., rest, guide, shoe and clamps (rather than assuming spacing based on 50-mm or 75-mm clearance between pipes).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Indian Oil buys first Colombian oil under Ecopetrol contract 12/31
- Ukrainian drone attack sparks fire, damages equipment at Tuapse refinery 12/31
- Chile's $2.5-B Volta green ammonia project wins environmental permit 12/31
- China begins issuing second batch of 2026 crude import quotas to refiners 12/31
- EIA: U.S. crude, fuel inventories rose in the week ended December 19 12/30
- Ghana's Tema oil refinery restarts after 9-yr shutdown 12/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

